The 24 years old wind farm in the Westerse Polder needs repowering. The seven wind turbines, with a combined installed capacity of 3.5 MW, will be replaced in 2019 by five modern wind turbines with 4 MW each.
The repowered wind farm Westerse Polder will generate green energy again in 2020 in the Hoeksche Waard.
ProjectWesterse PolderRealisatie2018Websitewindparkwestersepolder.nl